[Demonstration Report] Reduce work time by up to 70%! Revealing the labor-saving effects of "E-cat kit2" in collaboration with six major construction companies
Share
In order to solve the "labor shortage" and "2024 problem" in the construction industry, we have conducted a large-scale demonstration experiment using the electric unicycle " E-cat kit2 " in collaboration with six major construction companies (Shimizu Corporation, Daiwa House Industry, etc.).
We will report on the surprising results obtained at nine sites across the country.
- Work efficiency improved by up to 4.2 times : Work time was reduced by approximately 70% at mountainous sites, and by 15 to 40% at flat sites, making a significant contribution to overall construction process management.
- Over 95% of workers responded that they were not tired : In a survey of 44 workers, almost all of them felt that the physical burden had been reduced. Some even said that their level of fatigue had been reduced by half.
- Effectiveness proven in a variety of locations : Its practicality has been proven in a variety of harsh environments, including inside train stations, logistics centers, power line construction in mountainous areas, and inside tunnels.
Eliminate the "toughness of the workplace" and dramatically improve productivity. Here is a new transportation style for the digital transformation era.
[For more information, click here (official website)]
A full report summarizing detailed data for each site and actual usage scenarios is now available on the official website.
Construction DX Demonstration Experiment: Read the full report on reducing work time by 70% here
